Holštejn Bridge

Stage: Detailed Design
Client: FIRESTA-Fišer, rekonstrukce, stavby a.s.
Investor: Správa a údržba silnic, ČR
Date: IX. 2013 – VI. 2014

Technical Specifications:

Project for a one-way road bridge with a span of 70.0 m. The bridge is made of steel parapet beams of the I shape with steel crossbeams and composite reinforced concrete slab suspended by rod bars from a double plane steel arch (Langer girders). The bridge is located near the Moravian Karst Protected Landscape Area and carries local road through a geologically unstable area in the vicinity of White Stream.

The structure was awarded the prestigious award of Bridge of the Year in 2014.