Pedestrian bridge, Příbor
Stage: Detailed DesignClient: SHB a.s.
Investor: Town of Příbor
Date: VIII. 2013 – XI. 2013
Technical Specifications:
Implementation of a bycicle bridge over the I/58 bypass in Příbor. It is a cable stayed structure with a span of 43.0 m. The bridge deck consists of edge parapet girders made of laminated wood of constant depth of 0.7 m. Wooden deck is sopported on steel cross beams. The deck is suspended on a V-shaped steel pylon.