Highway D48, Rychaltice – Frýdek-Místek

Stage: Detailed Design
Client: SHB a.s.
Investor: Road and Motorway Directorate of the Czech Republic
Date: IV. 2009 – VI. 2010

Technical Specifications:

Implementation of a project with 14 bridge structures, retaining walls and a short tunnel on the D48 motorway, section Rychaltice – Frýdek-Místek. The project consists of a post-tensioned continuous three-span bridge with a main span of 22.0 m, a slab bridge with two spans of 23.5 m, several reinforced concrete frames with one span, tubosiders and one overpass. The project also included a pedestrian bridge.