Šantovka pedestrian bridge, Olomouc

Stage: Detailed Design
Client: IDS Olomouc, Metrostav
Investor: SMC Development
Date: IV. 2012 – III. 2013

Technical Specifications:

Implementation of a project for a pedestrian walkway providing access to the newly built shopping mall Gallery Šantovka. It is a continuous structure of seven-span across the November 17 Street, a pedestrian walkway and Mlýnský Stream. The footbridge enters the building on the second floor of the shopping gallery and is connected to the ground floor by an outdoor stairway forming part of the footbridge. The superstructure consists of post-tensioned continuous slab, which is supported by a system of branching steel tube supports. The longest span has a length of 28.6 m.