Peter Buček, Ph.D.

Peter has been working in our team since the end of 2007. After a short period in the Brno headquarters, he moved to the Slovak branch of the Link Projekt in Banská Bystrica and was on his way from the very beginning. He is currently acting as the responsible / leading designer.

KEY REFERENCES:

Concrete four-beam bridge over the D47 motorway, Ostrava

Concrete five-poster construction, designed as a four-span indirectly mounted on inner supports. The bridge, which is on a fixed spline, is additionally longitudinally and transversally pre-stressed. The total length of the bridge is 140 m, the main field span is 25.8 m.

Concrete bridge on road I / 66, bypass Brezna (SK)

Concrete five-poster construction. The bridge was built on a fixed spline and laterally biased. The total length of the bridge is 236 m, the main field span is 49 m.

Concrete double-brick bridge over expressway R2,
Bánovce nad Bebravou (SK)

Concrete three-pole continuous structure. The bridge is on a solid spline and it is additionally longitudinally biased. The total length of the bridge is 122 m, the main field span is 45.5 m.

Static and dynamic analysis of pedestrian bridge New Karolina in Ostrava

Static and dynamic analysis of the pedestrian bridge steel structure. Design of the vibration damper of the supporting structure. The total length is 146 m, the main field span is 102 m.